How Software Consultants Should Track Architecture Hours Without Dumping Them on Implementation - MinuteShark

Time Management

How Software Consultants Should Track Architecture Hours Without Dumping Them on Implementation

Architecture hours are the easiest billable work to lose, because they happen in the same chair as coding. You sketch the data model, write the RFC, spike the auth flow, argue with yourself about the queue, and then the timer is still sitting on Implementation. Friday looks busy. The estimate looks late. Nobody can see that half the overrun was design you never named.

Time tracking for software consultants fails here more often than it fails on meetings. Meetings at least have a calendar. Architecture has a whiteboard photo and a commit that looks like “wip.” If those hours land on Implementation, your estimates-versus-actuals report is a costume. We already argued that code and meetings should never share a task. This is the next leaf: Architecture is not Implementation, even when both produce files in the same repo.

The rule: name Architecture as its own task before the spike starts. Log the hours you can defend. Move to Implementation when you are building the thing you decided. Do not let the open coding task absorb the thinking that made the coding possible.

Why Implementation is a magnet for unpaid design

Clients understand “building.” They do not always understand “deciding.” So consultants hide deciding inside building. The spike that proved the vendor API cannot paginate becomes “Implementation, 6.5 hours.” The afternoon you spent choosing between two sync models becomes “backend.” Then the build estimate — which assumed a decided shape — looks like you are slow.

That is the same failure as putting standups on the coding task, just quieter. Estimates versus actuals fail when meetings live on Implementation. They also fail when architecture lives there. You cannot course-correct this week if the swollen bar is a blend of design, typing, and review. You also cannot tell a non-technical client why week one was “light on features” without sounding like you are making excuses. You are not. You are missing a named bucket.

Git history will not save you. Commits are not a timesheet. A day of architecture may produce twelve messages and no merge, or one merge that looks tiny. Billing from git trains you to undercount the work that prevents a rewrite. Track the chair, on the leaf that owned the decision.

A standing catalog you can copy onto every client

Do not invent a new taxonomy per logo. Copy a boring list onto each project so reports stay comparable. Time is tracked on a task. Projects are folders. If Architecture is missing, the hours have nowhere honest to go.

When does a spike become Implementation?

A useful test: would you defend this hour as “we decided” or “we built”? If the artifact is a recommendation, a rejected path, or a diagram, it is Architecture. If the artifact is production-shaped code you intend to ship, it is Implementation. Throwaway spike code can stay on Architecture. Copying the spike into the real service is Implementation. That split is slightly annoying at 2 p.m. and extremely useful at month-end.

Stop the clock when the job changes. One running timer is enough. You do not need three open clocks. You need the honesty to switch the leaf when you stand up from the whiteboard and sit down in the repo. If you forgot, log the slice you can defend on Architecture after the fact — not a reconstructed eight-hour block labeled Implementation because that task was already there.

What to say on the invoice without a glossary

You can still invoice by project. You do not have to show every spike. You do have to be able to answer “why is week one 18 hours with two screens?” Named Architecture hours are that answer: we spent the time reducing the chance week four is a rebuild. If a client only wants a project total, generate the report at project grain. Keep the tasks anyway. The catalog is for you. The PDF is for them.

A mid-project check that takes ten minutes

Once a week, look at one project, this period, pivoted to task. You want three numbers, not a novel: Architecture, Implementation, Meetings. If Architecture is zero and Implementation is huge, you are hiding design. If Architecture is huge and nothing is shipping, you may be stuck in deciding — that is a scope conversation, not a typing problem. If Meetings ate the week, the estimate was never about code.

Use that split when you quote the next phase. Architecture-heavy clients are not “slow developers.” They are clients whose systems are undecided. Price the deciding, or it will leak into the build and look like you cannot estimate. This is not a reason to start screenshot monitoring or to treat GitHub as the clock. It is a reason to put a leaf in the tree before you open the IDE.

Where MinuteShark keeps the leaf honest

If you already work in MinuteShark, time lives on a task inside Client → Project → Task (subtasks on Standard). Onboarding is still Add Client → Add Project → Add Task → Start Task — so add Architecture as a real task, not a note on Implementation. Start the timer from dashboard search when you sit down at the spike. Lock or close Architecture when the decisions are done if you do not want more hours landing there by habit. The getting started guide is the mechanical tour; this piece is the catalog habit.

MinuteShark AI can log the hour in plain English after you confirm a proposal card: “Log 1 hour on Architecture for today.” You can edit the card before confirm. Nothing is written until you confirm. It will not silently move a spike onto Implementation because that task had a running total. Official utterances exist for a reason — the product is built for that sentence. Generate a report with What × Who × When, pivot to task, and look at Architecture as its own bar. The reports guide is how the triad works.

If rounding is on, original duration stays stored and BILLABLE is the rounded-up view. Catch-up entries and timer entries flow into the same report. Starter is free if you are testing the habit (1 user, 3 clients, 5 projects). Standard is $5/user/month with a 30-day trial and no credit card. You do not need Jira keys as line items to see whether design ate the week. You need a named task and a duration you would say out loud.

James P., a solo consultant, said MinuteShark is “simple enough to use every day, powerful enough to trust.” Trust, for architecture hours, is a leaf that still exists on Friday.

Previous Post Back to Blog Next Post